References
Our project
Yours can be next
2025
Germany
Groob-werke, Mindelheim
Installation of new production lines and equipment in compliance with project specifications.
(The project, which has been ongoing for 22 months, is being executed by a team of two personnel and remains in progress.)
Paul Koster, Medebach
Assembly operations in the workshop
(A team of 3 assemblers has been engaged for 9 months, and the project is still ongoing.)
Valeo Wemding
Electrical installation works
(The project involves 2 electrical installers.)
Slovakia
Volvo, Valaliky
Electrical installation works, including assembly of cable routes, wire pulling, and connection of lighting and fire alarm systems.
(The project is being executed by a team of 5 electrical installers.)
2024
Germany
Ladenburger, Bopfingen
Installation of bird deterrent netting beneath the roofs of open halls.
(The project involved a total of 2 workers over a duration of 16 months.)
Groob-werke, Mindelheim
Installation of new production lines and equipment in accordance with project documentation.
(4 distinct projects for 3 customers. A total of 8 assemblers and 4 electrical installers were deployed, with an overall duration of 14 months. One project is still ongoing.)
CSA Group, Platlling
Assembly works
(2 workers deployed for a duration of 2 months.)
Felsomat, Koningsbach-Stein
Installation of new production lines and equipment for the automotive industry. Electrical, mechanical, and pneumatic works.
(The project involved a team of 6 workers over a total duration of 19 months.)
Lage
Assembly and welding works for the production of industrial kilns at the customer’s workshop.
(A team of 2 welders was intermittently deployed over a period of 24 months, and the project continues intermittently to this day.)
ThyssenKrupp Steel, Bochum
Electrical works on an inspection line.
(A total of 14 electricians were deployed for the project over a duration of 3 months.)
Paul Koster, Medebach
Assembly operations in the workshop
(A team of 3 assemblers has been engaged for 9 months, and the project is still ongoing.)
CATL, Arnstadt
Electrical works on production lines
(A team of 14 electricians was deployed for the project over a total duration of 4 months.)
Minden – Neuss
Electrical works for the relocation of a production line
(A team of 8 assemblers and 8 electricians was deployed for the project over a total duration of 4 months.)
S.G Autoglas, Herzogenrath
Electrical works, including the connection of a production line
(A team of 4 assemblers and 5 electricians was deployed for the project over a total duration of 3 months.)
Bad Kotzing – Wissenburg
Electrical works for the relocation of machinery and equipment
(A team of 5 assemblers and 7 electricians was deployed for the project over a total duration of 2 months.)
Graben-Neudorf
Electrical works for the relocation of machinery
(A team of 2 electricians was deployed for a duration of 1 month.)
Algaier Automotive, Mühlhause
Assembly and electrical works
(2 assemblers and 2 electricians from our team were involved in the project.)
Switzerland
Visp
Installation of cable routes, cable pulling, and connections.
(A team of 4 workers was deployed for the project over a total duration of 4 months.)
Slovakia
Muhle, Námestovo
Reconstruction of an elevator in an industrial kiln
(The project was delivered turnkey by our team in a record time of 18 hours (one day))
2023
Sweden
Northovolt, Skelleftea
Logistics of machinery and equipment. Unpacking machinery and equipment, transportation to designated positions, mechanical assembly. Electrical works. Assembly of various small steel structures.
(A team of 10 assemblers was intermittently deployed for the project over a total duration of 20 months.)
Germany
Kraftwerk Heyden, Petershagen
Welding and locksmith works for the repair of storage tanks.
(A team of 2 welders was deployed for the project over a duration of 2 months.)
Accumotive, Kamenz
Assembly operations for the manufacturing of machinery and equipment.
Ladenburger, Bopfingen
Installation of pigeon deterrent netting beneath the roofs of open halls.
(2 workers were deployed for the project for 16 months.)
SMS Group, Witten
Assembly works on machinery and equipment.
(2 assemblers were deployed for the project over 4 months.)
Robert Bosch Automotive Steering,Schvabisch Gmund
Assembly and electrical works.
(A team of 4 electricians and a team of 3 assemblers were deployed for the project.)
EMAG LaserTec, Heubach
Electrical and mechanical works on machinery and equipment.
(5 assemblers participated in the project over 3 months.)
Fritsch bakery technologies CO.KG, Kitzingen
Electrical works during the assembly of machinery.
Groob-werke, Mindelheim
Installation of new production lines and equipment in accordance with project documentation.
(2 different projects for various customers, involving a total team of 16 workers over a duration of 18 months.)
VAF, Bopfingen
Electrical works on production lines.
(3 electricians were deployed for the project over a total duration of 3 months, and 4 assemblers were deployed for 2 months.)
KS Huayu Alu tech, Neckarsulm
Mechanical and electrical works.
(3 assemblers participated in the project over a duration of 4 months.)
Felsomat, Koningsbach-Stein
Installation of new production lines and equipment for the automotive industry. Electrical, mechanical, and pneumatic works.
(A team of 6 workers was deployed for the project over a total duration of 19 months.)
Porsche Leipzig, Leipzig
Mechanical works during a shutdown. Mechanical works on portal elevators, machinery, and equipment.
(A team of 12 assemblers was deployed for the project over a duration of 1 month.)
BHS Sonthofen, Sonthofen
Assembly works for the production of industrial filters at the customer’s workshop.
(A team of 3 assemblers was intermittently deployed for the project over a total duration of 30 months.)
Taibinger&CO Sondermaschinenbau, Kindberg
Welding work in the workshop and at the customer’s site, as well as short-term installations of manufactured fixtures and products at end customers.
(A team of 2 assemblers and 2 welders was assigned to the project for an intermittent duration of 16 months.)
Sulzemoos
Assembly and logistics work at the customer’s workshop.
(Two workers operated intermittently at the customer’s workshop for a duration of 12 months.)
BMW-AG werk, Vaterstetten
Mechanical work on production lines.
(The project involved a team of 8 assemblers and was completed over a period of 3 months.)
Continental Reifen, Korbach
Assembly of machinery and equipment.
Man truck&bus, Nurnberg
Electrical work on production lines.
VW werk Kassel, Baunatal
Mechanical assembly of equipment for the automotive industry.
Elma Schmidbauer, Singen
Electrical installation work on machinery and equipment.
Dr. Schneider Group, Kronach
Mechanical support and assembly assistance.
Austria
Lage
Assembly and welding tasks during the production of industrial kilns at the customer’s workshop.
Voest Alpine, Kindberg
Welding and assembly tasks performed at the customer’s workshop.
Fahrzeugbau, Ressenig
Assembly, disassembly, and welding tasks.
GORIUP Feuerfest, Trofaiach
Disassembly, assembly, and welding tasks.
Hungary
Audi Hungaria Zrt.
Inspection and repairs of industrial kilns for a German customer.
2022
Romania
Star Transmission S.R.L., Alba
Unloading and assembly of machinery and equipment for the automotive industry.
Sweden
Northvolt, Skellefteå
Logistics of machinery and equipment. Unpacking, transportation to designated positions, mechanical assembly, electrical work, and assembly of various small steel structures.
(The project involved 10 assemblers over an intermittent duration of 20 months.)
Germany
BHS Sonthofen, Sonthofen
Assembly work for the production of industrial filters at the customer’s workshop.
Dr. Schneider Group, Kronach
Mechanical support and assistance with assembly tasks.
Mercedes-Benz AG, Rastatt
Participation in the relocation of machinery and equipment for the automotive industry. Dismantling, packaging, and loading onto trucks, followed by reassembly in Romania.
Ladenburger, Bopfingen
Installation of pigeon nets under the roofs of open halls.
BHS Sonthofen, Sonthofen
Assembly work for the production of industrial filters at the customer’s workshop.
Taibinger & CO Sondermaschinenbau, Kindberg
Welding work at the customer’s workshop, along with short-term assembly of manufactured fixtures and products at end customers’ sites.
Sulzemoos
Assembly and logistics work at the customer’s workshop.
Austria
Voest Alpine, Kindberg
Welding and assembly work at the customer’s workshop.
2021
Northvolt, Skellefteå
Sweden
Northvolt, Skellefteå
Logistics of machinery and equipment. Unpacking, transportation to designated positions, mechanical assembly, electrical work, and assembly of various small steel structures.
Gernany
ThyssenKrupp System Engineering, Heilbronn
Pneumatic and electrical work on robotic grippers designed for the automotive industry.
BMW Group Werk, Dingolfing
Dismantling of conveyors and steel flooring.
BMW Group Werk, Regensburg
Assembly of electrical switchgear and mechanical installations.
BHS Sonthofen, Sonthofen
Assembly work for the production of industrial filters at the customer’s workshop.
VW Werk, Zwickau
Continuation of the project: Mechanical support for the implementation of a new model on the production line.
VW Werk, Wolfsburg
Continuation of the project: Mechanical support for the implementation of a new model on the production line.
Austria
Taibinger & CO Sondermaschinenbau, Kindberg
Welding work at the customer’s workshop, along with short-term assembly of manufactured fixtures and products at end customers’ sites.
Voest Alpine, Kindberg
Welding and assembly work at the customer’s workshop.
Czech Republic
Vitterra Cech, Ústí nad Labem
Mechanical work on conveyors. Replacement of bearings, welding of conveyors, and replacement of belts and buckets on conveyors.
Gas Storage, Tvrdonice
Welding and mechanical work for the reconstruction of gas storage facilities.
2020
France
D.ARA Composite, Saint-Soupplets
Dismantling of various machinery and equipment.
Belgium
DAF Trucks, Westerlo
Assembly of a production line for truck cabins.
Netherlands
VDL Steelweld, Breda
Dismantling of a painting line for truck cabin production.
Czech Republic
Unipetrol Litvínov
Mechanical work during shutdown. Replacement of flanges and valves on pipelines, as well as dismantling tasks.
Vitterra Cech, Ústí nad Labem
Mechanical work on conveyors. Replacement of bearings, welding of conveyors, and replacement of belts and buckets on conveyors.
Frýdecko-Místecký Obchvat, Frýdek-Místek
Assembly of steel structures.
Germany
VW Werk, Zwickau
Continuation of the project: Mechanical support for the implementation of a new model on the production line.
VW Werk, Wolfsburg
Continuation of the project: Mechanical support for the implementation of a new model on the production line.
IDH Glauchau
Continuation of the project: Assembly work at the customer’s workshop
VW Werk, Baunatal
Continuation of the project: Mechanical support for the installation of a Schuler press.
ThyssenKrupp System Engineering, Heilbronn
Pneumatic and electrical work on robotic grippers designed for the automotive industry.
2019
Germany
VW Werk, Zwickau
Mechanical support for the implementation of a new model on the production line.
VW Werk, Wolfsburg
Mechanical support for the implementation of a new model on the production line.
IDH Glauchau
Assembly work at the customer’s workshop.
VW Werk, Baunatal
Mechanical support for the installation of a Schuler press.
Italy
Bruneck
Mechanical and electrical assistance for the dismantling of a painting line.