References

Our project

Yours can be next

Installation of new production lines and equipment in compliance with project specifications.
(The project, which has been ongoing for 22 months, is being executed by a team of two personnel and remains in progress.)

Assembly operations in the workshop
(A team of 3 assemblers has been engaged for 9 months, and the project is still ongoing.)

Electrical installation works
(The project involves 2 electrical installers.)

Volvo, Valaliky

Electrical installation works, including assembly of cable routes, wire pulling, and connection of lighting and fire alarm systems.
(The project is being executed by a team of 5 electrical installers.)

Germany
Ladenburger, Bopfingen

Installation of bird deterrent netting beneath the roofs of open halls.
(The project involved a total of 2 workers over a duration of 16 months.)

Installation of new production lines and equipment in accordance with project documentation.
(4 distinct projects for 3 customers. A total of 8 assemblers and 4 electrical installers were deployed, with an overall duration of 14 months. One project is still ongoing.)

Assembly works
(2 workers deployed for a duration of 2 months.)

Installation of new production lines and equipment for the automotive industry. Electrical, mechanical, and pneumatic works.
(The project involved a team of 6 workers over a total duration of 19 months.)

Assembly and welding works for the production of industrial kilns at the customer’s workshop.
(A team of 2 welders was intermittently deployed over a period of 24 months, and the project continues intermittently to this day.)

Electrical works on an inspection line.
(A total of 14 electricians were deployed for the project over a duration of 3 months.)

Assembly operations in the workshop
(A team of 3 assemblers has been engaged for 9 months, and the project is still ongoing.)

Electrical works on production lines
(A team of 14 electricians was deployed for the project over a total duration of 4 months.)

Electrical works for the relocation of a production line
(A team of 8 assemblers and 8 electricians was deployed for the project over a total duration of 4 months.)

Electrical works, including the connection of a production line
(A team of 4 assemblers and 5 electricians was deployed for the project over a total duration of 3 months.)

Electrical works for the relocation of machinery and equipment
(A team of 5 assemblers and 7 electricians was deployed for the project over a total duration of 2 months.)

Electrical works for the relocation of machinery
(A team of 2 electricians was deployed for a duration of 1 month.)

Assembly and electrical works
(2 assemblers and 2 electricians from our team were involved in the project.)

Visp

Installation of cable routes, cable pulling, and connections.
(A team of 4 workers was deployed for the project over a total duration of 4 months.)

Muhle, Námestovo

Reconstruction of an elevator in an industrial kiln
(The project was delivered turnkey by our team in a record time of 18 hours (one day))

Sweden
Northovolt, Skelleftea

Logistics of machinery and equipment. Unpacking machinery and equipment, transportation to designated positions, mechanical assembly. Electrical works. Assembly of various small steel structures.
(A team of 10 assemblers was intermittently deployed for the project over a total duration of 20 months.)

Kraftwerk Heyden, Petershagen

Welding and locksmith works for the repair of storage tanks.
(A team of 2 welders was deployed for the project over a duration of 2 months.)

Assembly operations for the manufacturing of machinery and equipment.

Installation of pigeon deterrent netting beneath the roofs of open halls.
(2 workers were deployed for the project for 16 months.)

Assembly works on machinery and equipment.
(2 assemblers were deployed for the project over 4 months.)

Assembly and electrical works.
(A team of 4 electricians and a team of 3 assemblers were deployed for the project.)

Electrical and mechanical works on machinery and equipment.
(5 assemblers participated in the project over 3 months.)

Electrical works during the assembly of machinery.

Installation of new production lines and equipment in accordance with project documentation.
(2 different projects for various customers, involving a total team of 16 workers over a duration of 18 months.)

Electrical works on production lines.
(3 electricians were deployed for the project over a total duration of 3 months, and 4 assemblers were deployed for 2 months.)

Mechanical and electrical works.
(3 assemblers participated in the project over a duration of 4 months.)

Installation of new production lines and equipment for the automotive industry. Electrical, mechanical, and pneumatic works.
(A team of 6 workers was deployed for the project over a total duration of 19 months.)

Mechanical works during a shutdown. Mechanical works on portal elevators, machinery, and equipment.
(A team of 12 assemblers was deployed for the project over a duration of 1 month.)

Assembly works for the production of industrial filters at the customer’s workshop.
(A team of 3 assemblers was intermittently deployed for the project over a total duration of 30 months.)

Welding work in the workshop and at the customer’s site, as well as short-term installations of manufactured fixtures and products at end customers.

(A team of 2 assemblers and 2 welders was assigned to the project for an intermittent duration of 16 months.)

Assembly and logistics work at the customer’s workshop.

(Two workers operated intermittently at the customer’s workshop for a duration of 12 months.)

Mechanical work on production lines.
(The project involved a team of 8 assemblers and was completed over a period of 3 months.)

Assembly of machinery and equipment.

Electrical work on production lines.

Mechanical assembly of equipment for the automotive industry.

Electrical installation work on machinery and equipment.

Mechanical support and assembly assistance.

Lage

Assembly and welding tasks during the production of industrial kilns at the customer’s workshop.

Welding and assembly tasks performed at the customer’s workshop.

Assembly, disassembly, and welding tasks.

Disassembly, assembly, and welding tasks.

Audi Hungaria Zrt.

Inspection and repairs of industrial kilns for a German customer.

Romania
Star Transmission S.R.L., Alba

Unloading and assembly of machinery and equipment for the automotive industry.

Northvolt, Skellefteå

Logistics of machinery and equipment. Unpacking, transportation to designated positions, mechanical assembly, electrical work, and assembly of various small steel structures.
(The project involved 10 assemblers over an intermittent duration of 20 months.)

BHS Sonthofen, Sonthofen

Assembly work for the production of industrial filters at the customer’s workshop.

Mechanical support and assistance with assembly tasks.

Participation in the relocation of machinery and equipment for the automotive industry. Dismantling, packaging, and loading onto trucks, followed by reassembly in Romania.

 Installation of pigeon nets under the roofs of open halls.

Assembly work for the production of industrial filters at the customer’s workshop.

Welding work at the customer’s workshop, along with short-term assembly of manufactured fixtures and products at end customers’ sites.

Assembly and logistics work at the customer’s workshop.

Voest Alpine, Kindberg

Welding and assembly work at the customer’s workshop.

Northvolt, Skellefteå
Sweden
Northvolt, Skellefteå

Logistics of machinery and equipment. Unpacking, transportation to designated positions, mechanical assembly, electrical work, and assembly of various small steel structures.

ThyssenKrupp System Engineering, Heilbronn

Pneumatic and electrical work on robotic grippers designed for the automotive industry.

Dismantling of conveyors and steel flooring.

Assembly of electrical switchgear and mechanical installations.

Assembly work for the production of industrial filters at the customer’s workshop.

Continuation of the project: Mechanical support for the implementation of a new model on the production line.

Continuation of the project: Mechanical support for the implementation of a new model on the production line.

Taibinger & CO Sondermaschinenbau, Kindberg

Welding work at the customer’s workshop, along with short-term assembly of manufactured fixtures and products at end customers’ sites.

Welding and assembly work at the customer’s workshop.

Vitterra Cech, Ústí nad Labem

Mechanical work on conveyors. Replacement of bearings, welding of conveyors, and replacement of belts and buckets on conveyors.

Welding and mechanical work for the reconstruction of gas storage facilities.

France
D.ARA Composite, Saint-Soupplets

Dismantling of various machinery and equipment.

DAF Trucks, Westerlo

Assembly of a production line for truck cabins.

VDL Steelweld, Breda

Dismantling of a painting line for truck cabin production.

Unipetrol Litvínov

Mechanical work during shutdown. Replacement of flanges and valves on pipelines, as well as dismantling tasks.

Mechanical work on conveyors. Replacement of bearings, welding of conveyors, and replacement of belts and buckets on conveyors.

 Assembly of steel structures.

VW Werk, Zwickau

Continuation of the project: Mechanical support for the implementation of a new model on the production line.

Continuation of the project: Mechanical support for the implementation of a new model on the production line.

Continuation of the project: Assembly work at the customer’s workshop

Continuation of the project: Mechanical support for the installation of a Schuler press.

Pneumatic and electrical work on robotic grippers designed for the automotive industry.

Germany
VW Werk, Zwickau

Mechanical support for the implementation of a new model on the production line.

Mechanical support for the implementation of a new model on the production line.

Assembly work at the customer’s workshop.

Mechanical support for the installation of a Schuler press.

Bruneck

Mechanical and electrical assistance for the dismantling of a painting line.